SAP cProjects replication: Set task-level WBS


When creating a project in cProjects I am using BADI BADI DPR_FIN_GECCO_ATTR to manipulate the external WBS ID that is created in SAP PS.

SAP accepts the ID that I pass for the Phase level, but for the Task level SAP appends a string "/TTO" to the end of my WBS ID. Any idea why this happens and how I can get rid of it. The "/TTO" violates or masking structure in PS?

constants: lc_phase_id_ps type char30 value 'DPR_TV_PROJECT_ELEMENT_ID_PS',
           lc_task_id_co  type char30 value 'DPR_TV_PROJECT_ELEMENT_ID_CO'.

field-symbols: <project_ext> type dpr_ts_project_ext,
               <project_int> type dpr_ts_project_int,
               <phase_ext>   type dpr_ts_phase_ext,
               <phase_int>   type dpr_ts_phase_int,
               <task_ext>    type dpr_ts_task_ext,
               <task_int>    type dpr_ts_task_int,
               <attributes>  type dpr_ts_iaom_object_attribute.

case ir_common->get_object_type( ).
  when cl_dpr_co=>sc_ot_project.
    "not doing anything with this data yet
    assign ir_project_ext->* to <project_ext>.
    assign ir_project_int->* to <project_int>.  

  when cl_dpr_co=>sc_ot_phase.
    assign ir_attributes_ext->* to <phase_ext>.
    assign ir_attributes_int->* to <phase_int>.
    read table ct_attributes assigning <attributes>
      with key data_element = lc_phase_id_ps.
    if sy-subrc = 0.
      <attributes>-value = <phase_ext>-phase_id.  "something like Z/001-001
    endif.

  when cl_dpr_co=>sc_ot_task.
    assign ir_attributes_ext->* to <task_ext>.
    assign ir_attributes_int->* to <task_int>.
    read table ct_attributes assigning <attributes>
      with key data_element = lc_task_id_co.
    if sy-subrc = 0.
      <attributes>-value = <task_ext>-search_field.  "something like Z/001-001-001
      "sometime after this badi call it is changed to Z/001-001-001/TTO
    endif.
endcase.

Solution

  • I have found the spot where SAP changes the WBS:

    In Class CL_IM_CPRO_PROJECT_LABEL method IF_EX_GCC_PS_PROJECT_LABEL~GET_WBS_ELEMENT there is the following logic:

    if lv_object_type_co ne 'DPO'.
      read table attributes_of_ext_obj
           into ls_attribute
           with key data_element = 'DPR_TV_PROJECT_ELEMENT_ID_CO'.
      if sy-subrc = 0.
        if lv_object_type_co eq 'TTO' or     "Aufgabe            "H860739
           lv_object_type_co eq 'ITO'.       "Checklistenpunkt   "H860739
          concatenate ls_attribute-value                         "H860739 
                      lv_object_type_co                          "H860739
                      into ls_value.         "<<==Here it is     "H860739
          wbs_element = ls_value.                                "H860739
        else.                                                    "H860739
          wbs_element = ls_attribute-value.
        endif.                                                   "H860739
      else.
        message e013(iaom_cprojects)
          with 'DPR_TV_PROJECT_ELEMENT_ID_CO'
          raising error_occurred.
      endif.
      "...
      "... Code removed
    endif.
    

    This is part of a standard BAdI implementation for GCC_PS_PROJECT_LABEL.

    I have solved the problem by enhancing the method using the implicit enhancement point at the end of the method and resetting the WBS element there.